ISO 9001:2015 · IATF 16949 · RVIA member · EC type approval
Exporting to 14 markets DEMO · contact details are placeholders
ATLASCOACHWORKS 中文
Start a programme
Aluminium-bodied travel trailer parked beside a fjord road at dusk, interior lights on
OEM / ODM coachbuilding · since 2004

We build the RVs.
You build the brand.

A coachbuilder in Ningbo with design, tooling, lamination and series assembly under one roof. Turnkey programmes from 30 units — homologated for the market you sell in.

62
Programmes delivered
1,400
Units per year
42,000m²
Under roof
14
Export markets
01 — How we work

Three ways to put
your badge on a vehicle.

Most first conversations stall on the same question: how much of the vehicle do we actually have to invent? Here are the three contracts we run, with the numbers attached.

A Turnkey OEM

You bring the brand. We bring the rest.

Design, engineering, tooling, homologation and series build under one contract. Your team approves at six gates; we carry everything between them.

MOQ
30 units
To SOP
14–18 months
You own
Design IP, tooling, type-approval file
Best for new brands and distributors going private-label.
B Platform licence — ODM

Start from a homologated base.

Take a platform already in series production, re-skin the exterior and re-lay the interior. The expensive part — engineering and certification — is already paid for.

MOQ
20 units
To SOP
5–7 months
You own
Your badge, graphics and interior layout
Best for brands testing a new segment without tooling risk.
C Build-to-print

Your design, our floor.

You hold the design and the drawings; we hold the process, the jigs and the quality file. Includes DFM review, cost-down and the production conformity record.

MOQ
60 units
Onboarding
3 months
You own
Everything. We sign an NDA and a no-compete.
Best for established OEMs adding capacity or a second source.
02 — Design

You see the vehicle
before you commit
a dollar to tooling.

Our studio works inside the same building model as your team. Surface, layout and systems are resolved in CAD, confirmed in clay and proven on a running prototype — before a single mould is cut.

01

Industrial design

Surface language, graphics and exterior packaging. Full-size milled model and clay buck at every gate review — reviewed in person or by scan.

02

Interior architecture

Floor plans, furniture systems, lighting scenes and trim specification down to the hardware SKU. Built for a target price, not a mood board.

03

Engineering & homologation

Structural and thermal FEA, 12 V / 230 V electrical, LPG and water systems, plus the approval documentation your market requires.

Clay model in 6 weeks Target-cost engineering Your CAD or ours
Designer sketching beside a clay model of a travel trailer, 3D wireframe on screen
Design studio
Concept & surface
Gate 02
Rows of travel trailer shells on an assembly line
03 — Production

Capacity claims
are cheap.
Here is ours.

Six lines under one roof, with lamination, CNC, welding, paint and final assembly in sequence — not spread across a chain of subcontractors you have never audited.

06
Production lines
1,400/yr
Units per year
42,000m²
Under roof
100%
Water tested
±1.5mm
Body tolerance
21d
Line cycle
Your engineers are welcome on the floor at any gate. We run open-book cost reviews — BOM, labour and overhead lines are shown, not summarised.
04 — Platforms

Your badge.
Our platform.

Three platforms already homologated and in series production. Re-skin them, re-lay them out, or use them as the baseline for something new. Tooling is contractually yours.

APEX 24
Travel trailer · tandem axle
In production
LOA 24′0″7.32 m
GVWR
7,200 lb
Berths
4
Body
Filon / alum. frame
Cycle
18 days
ATLAS C32
Class C motorhome
In production
LOA 32′4″9.85 m
GVWR
14,500 lb
Berths
6
Chassis
Iveco Daily 35S
Cycle
26 days
VAN 170
Camper van conversion
In production
LOA 19′8″5.99 m
GVWR
9,350 lb
Berths
2 + 2
Chassis
Mercedes Sprinter 170″
Cycle
12 days
MOQ from 20 units Engineering support included White-label documentation Tooling ownership transferred
Travel trailer interior with oak cabinetry and a panoramic window onto pine forest

Nobody buys a floor plan. They buy the twenty minutes after they park.

Interior craft is where most OEM programmes quietly lose their margin — and their warranty budget. Ours is in-house: cabinet shop, upholstery, wiring harnesses and final fit under the same roof as the shell.

Atlas Coachworks — interior division, Ningbo
05 — Compliance

Every market has
its own paperwork.

A vehicle that is legal in Rotterdam is not legal in Sydney. We keep a homologation engineer on staff and have taken the same platform through five different approval routes.

Market Approval route What we prepare in-house Typical lead time
European UnionEU-27 EC whole-vehicle type approval, (EU) 2018/858; ECE R-… component approvals Technical file, CoC data, E-marked lighting and couplings, LPG and gas installation certificate 10–14weeks
United KingdomGB GB type approval via VCA; UKCA marking, plus IVA where the model falls outside scope GB approval pack, UKCA technical file, separate chassis and gas documentation 10–14weeks
United StatesFMVSS + RVIA FMVSS self-certification (49 CFR 571), NHTSA VIN and 565/566 filings, RVIA compliance label FMVSS test reports, VIN assignment, RVIA inspection file, CARB paperwork for California 8–12weeks
Australia / NZRVSA Road Vehicle Standards Act — vehicle type approval with an approved holder RVSA evidence pack, ADR compliance matrix, brake and coupling test data 12–16weeks
Gulf statesGSO / SASO GCC conformity (GSO) for the six member states; SASO for Saudi Arabia GSO conformity certificate, Arabic labelling, high-ambient cooling and insulation spec 6–10weeks
Lead times are indicative and start from design freeze. Final scope — and who signs as manufacturer of record — is fixed in the feasibility letter, per programme.
06 — Process

Eighteen months,
six gates, no surprises.

Every programme runs to the same gated timeline. Each gate has a deliverable you can hold, a fixed cost and a decision that belongs to you — not to us.

012 weeks

Brief & feasibility

Market, price point, target cost and volume reviewed against the platform options.

Gate 01 — feasibility letter
026 weeks

Concept & design freeze

Two exterior and interior directions, two review rounds, one direction frozen.

Gate 02 — clay + CAD sign-off
038 weeks

Engineering & compliance

Full CAD, systems routing, BOM, cost-out and the homologation plan for your market.

Gate 03 — open-book cost review
0410 weeks

Prototype & validation

Two running prototypes: road, water ingress, thermal, and 5,000-cycle durability.

Gate 04 — prototype sign-off
0514 weeks

Tooling & pre-series

Moulds, jigs and fixtures built, pre-series builds inspected, operators trained.

Gate 05 — PPAP-level pre-series
064 weeks

SOP & ramp

Series production, first-article inspection, ramp to contracted weekly volume.

Gate 06 — first-article release
Total: 18 months to start of production · 6 client decision gates Book a feasibility call
07 — Quality

Documented,
not promised.

Audits are welcome and unannounced. Everything below is evidenced in a report you receive with each shipment — because your distributor will ask.

Certified process discipline

ISO 9001:2015 since 2011 and IATF 16949 core tools applied to RV build — PFMEA, control plans, PPAP-level pre-series.

100% water and gas leak test

Every unit goes through a rain rig and a pressure-decay LPG test. No sampling, no exceptions, no unit leaves untested.

Traceability by VIN

1,400 checkpoints logged against each chassis number — component batch, operator, station and torque record.

Homologation in-house

Approval documentation prepared by our own compliance team, not outsourced to a consultant at the last gate.

Independent audits

TÜV Rheinland and Bureau Veritas social and technical audits available to your team, with findings shared unfiltered.

Warranty backed by the plant

Five-year structural warranty held by the factory, with a parts pool in Rotterdam. Not a distributor promise we can walk away from.

Hand riveting brushed aluminium panels on an RV body
Panel shop
Aluminium skin, hand-riveted
Station 04
Archive photograph of a row of recreational vehicles on a concrete apron
Since 2004 — 21 years of coachbuilding

We started as a three-bay repair shop for imported motorhomes. That is where we learned what actually breaks on a vehicle at year seven — and why our engineering team still signs off on serviceability before style.

Container terminal at dawn with gantry cranes
08 — Delivery

Out of the plant
in 45 days.

Ningbo is the second-largest container port in the world and our gate is 22 km from it. Units leave on flat-racks or in high-cube containers, depending on the model.

Terms
FOB · CIF · DAP
Port of loading
Ningbo / Beilun
Pre-shipment inspection
Welcome, at your cost
Documentation
B/L, packing list, CoC, EUR.1
Request a freight quote
1–2units
Per 40′ HC container
3units
Per flat-rack, wheels off
45d
Plant to loading
22km
Plant to terminal
Case — Nordic client
300 units.
One badge.
Fourteen months.
Private-label travel trailer programme
Denmark & Germany · 2024–2025
“We had a floor plan, a price target and no factory. Atlas took the concept to a homologated, water-tested unit in fourteen months — and the cost review at gate three was the first time a supplier had shown us the numbers rather than a discount.”
Founder — Northern European RV brand
09 — Questions

Asked before
every contract.

These are the eight things buyers actually ask on the first call. If yours is not here, it will be answered within one working day.

Ask something else
What is the minimum order quantity?
30 units for a turnkey OEM programme, 20 on a licensed platform, 60 for build-to-print. Below those numbers the tooling amortisation stops making sense for both sides — we will say so in the feasibility letter rather than sell you a bad programme.
Who owns the tooling and the design?
You do. Tooling is invoiced separately and its ownership transfers on payment, with a physical handover of the moulds or a buy-back clause if you move production. Design IP is assigned to you at gate 03. We keep no right to resell your design, your graphics or your floor plan — and we will sign a no-compete for your market.
Will you build for a competitor in the same country?
Not on the same platform, and not without telling you. Territory exclusivity is available from 150 units a year on a single platform. For smaller programmes we disclose every active client in your market before gate 02 — you decide with the facts in hand.
What does a prototype cost?
€45,000–90,000 for two running prototypes, depending on platform and systems complexity. At 100+ units the prototype cost is credited against your first series invoice. A clay model alone, before any engineering, is €12,000–18,000.
What are the payment terms?
30% at tooling release, 40% at pre-series sign-off, 30% against the bill of lading. Letter of credit at sight is accepted for a first order. We do not ask for full prepayment on series units, and we do not ship against open account in year one.
Can we audit the factory?
Yes — announced or unannounced, any working day. BSCI and Sedex social audit reports are available under NDA before you travel. Your engineers can stay on the floor through a full build cycle; we will put them in the line meeting too.
How long does a programme take?
14–18 months from brief to start of production on a new platform. 5–7 months if you start from an existing homologated platform. Build-to-print is 3 months of onboarding, then the line cycle applies — 12 to 26 days per unit depending on model.
What warranty do you give?
Five years structural, two years habitation, held by the plant rather than a distributor. A parts pool sits in Rotterdam for European customers; we ship spares within 5 working days and support your dealer network directly during the warranty period.
10 — Start a programme

Tell us what
you want to build.

Send a brief, a floor-plan sketch, or just a price point and a target volume. You will get a written feasibility answer — cost, timing and risk — within five working days.

NDA signed before we see your drawings
Feasibility letter with fixed tooling cost
Factory visit arranged within three weeks
Design studio
Demo Design StudioExample Street 123
Fictional City, 00000
Plant
Demo FactoryExample Factory Road 123
Fictional City, 00000
Sales
demo@example.com+00 000 000 0000
Languages
English · 中文Demo content only

Programme inquiry

Only email is required

Demo form only. Submissions are not sent or stored.

Demo only — your inquiry has not been sent or stored.